2002 Turbo Nissan SpecV: Charge pipe fabrication
The SpecV has returned on her own power now that she is turbocharged. We recently modified the downpipe and dumptube and being satisfied with our previous work he brought the car back for some aluminum welding.
The original piping kit required the drivers side fog light to be removed while the passenger side could remain stock
How the car arrived (no bumper):

After cutting and welding:

Bumper now installed w fog lights:

Thanks for looking !
If your in need of welding work contact
Proven Power LLC
8602 Temple Terrace Hwy C14
Temple Terrace FL 33637
813-988-DYNO(3966)
Home Page
2002 Turbo Spec-V charge pipe fabrication
The original piping kit required the drivers side fog light to be removed while the passenger side could remain stock
How the car arrived (no bumper):

After cutting and welding:

Bumper now installed w fog lights:

Thanks for looking !
If your in need of welding work contact
Proven Power LLC
8602 Temple Terrace Hwy C14
Temple Terrace FL 33637
813-988-DYNO(3966)
Home Page
2002 Turbo Spec-V charge pipe fabrication



