The begininng of my GS300 project!
Here are some BEFORE pictures of my GS300. Doing full House of Kolor paint, engine, brakes, wheels, body kit, etc.......will be up and running within 2 weeks!
Engine = '99 Aristo 2jz-gte clip
IC = Precision 600HP core w/ custom DC piping
Paint = House of Kolor Platiunm Pearl
Brakes = 6 piston front Rotora / 4 piston rear Rotora
Body Kit = Wald Sportline Series
Rims = Lowenhart LSR
and a lot more!!!!!







Engine = '99 Aristo 2jz-gte clip
IC = Precision 600HP core w/ custom DC piping
Paint = House of Kolor Platiunm Pearl
Brakes = 6 piston front Rotora / 4 piston rear Rotora
Body Kit = Wald Sportline Series
Rims = Lowenhart LSR
and a lot more!!!!!







__________________
Driven Concepts, LLC
1101A East Hillsborough Ave.
Tampa, Florida 33604
813-236-4500
Monday - Friday 9am - 6pm
WE ARE DIRECT
Tein, GReddy, Buddy Club, Bride, Tanabe, K-Sport, Power Enterprise, etc......
https://www.tamparacing.com/forums/d...ml#post4905630
Driven Concepts, LLC
1101A East Hillsborough Ave.
Tampa, Florida 33604
813-236-4500
Monday - Friday 9am - 6pm
WE ARE DIRECT
Tein, GReddy, Buddy Club, Bride, Tanabe, K-Sport, Power Enterprise, etc......
https://www.tamparacing.com/forums/d...ml#post4905630
Last edited by SpottedMango; Aug 19, 2006 at 11:44 AM.
That's a guesstimate honestly. The car's being worked on each and every day, would be nice to have it done by the end of the not this weekend, but the following. The paint process is what's going to take the most time. Body work's getting done as we speak and the paint will be here by Friday, so hopefully, it will be in the booth by this weekend!
__________________
Driven Concepts, LLC
1101A East Hillsborough Ave.
Tampa, Florida 33604
813-236-4500
Monday - Friday 9am - 6pm
WE ARE DIRECT
Tein, GReddy, Buddy Club, Bride, Tanabe, K-Sport, Power Enterprise, etc......
https://www.tamparacing.com/forums/d...ml#post4905630
Driven Concepts, LLC
1101A East Hillsborough Ave.
Tampa, Florida 33604
813-236-4500
Monday - Friday 9am - 6pm
WE ARE DIRECT
Tein, GReddy, Buddy Club, Bride, Tanabe, K-Sport, Power Enterprise, etc......
https://www.tamparacing.com/forums/d...ml#post4905630
Here are some more pictures for everyone!
Everything's taken off, every weather strip, every removable body panel....

Doors, hood, truck, etc will all soon be taken off....

Lowenhart LSR 20X9 and 20X10

Lowenhart LSR fronts...

Precision 600HP core...

Left = Rotora 6 piston front...
Right = Rotora 4 piston rear...
Middle = Nissan 300zx Z32 caliper...
How do you like that comparison!

Here's the paint that I am using for the GS, it's called House of Kolor Platiunm Pearl.
Everything's taken off, every weather strip, every removable body panel....

Doors, hood, truck, etc will all soon be taken off....

Lowenhart LSR 20X9 and 20X10

Lowenhart LSR fronts...

Precision 600HP core...

Left = Rotora 6 piston front...
Right = Rotora 4 piston rear...
Middle = Nissan 300zx Z32 caliper...
How do you like that comparison!

Here's the paint that I am using for the GS, it's called House of Kolor Platiunm Pearl.
__________________
Driven Concepts, LLC
1101A East Hillsborough Ave.
Tampa, Florida 33604
813-236-4500
Monday - Friday 9am - 6pm
WE ARE DIRECT
Tein, GReddy, Buddy Club, Bride, Tanabe, K-Sport, Power Enterprise, etc......
https://www.tamparacing.com/forums/d...ml#post4905630
Driven Concepts, LLC
1101A East Hillsborough Ave.
Tampa, Florida 33604
813-236-4500
Monday - Friday 9am - 6pm
WE ARE DIRECT
Tein, GReddy, Buddy Club, Bride, Tanabe, K-Sport, Power Enterprise, etc......
https://www.tamparacing.com/forums/d...ml#post4905630
I am not too much of a red or maroon fan. The thing is, you are not the only person to have mentioned that......
As for progress, well, I was hoping to get the thing done in about 2 weeks, but with the amount of work load we have right now, I don't think that's reasonable. I am thinking more on the three week time frame. The bay will be painted this weekend and the motor will start to go back in next weekend, after that takes place, the final stage will be paint.
As for progress, well, I was hoping to get the thing done in about 2 weeks, but with the amount of work load we have right now, I don't think that's reasonable. I am thinking more on the three week time frame. The bay will be painted this weekend and the motor will start to go back in next weekend, after that takes place, the final stage will be paint.
__________________
Driven Concepts, LLC
1101A East Hillsborough Ave.
Tampa, Florida 33604
813-236-4500
Monday - Friday 9am - 6pm
WE ARE DIRECT
Tein, GReddy, Buddy Club, Bride, Tanabe, K-Sport, Power Enterprise, etc......
https://www.tamparacing.com/forums/d...ml#post4905630
Driven Concepts, LLC
1101A East Hillsborough Ave.
Tampa, Florida 33604
813-236-4500
Monday - Friday 9am - 6pm
WE ARE DIRECT
Tein, GReddy, Buddy Club, Bride, Tanabe, K-Sport, Power Enterprise, etc......
https://www.tamparacing.com/forums/d...ml#post4905630




