*sigh*
Just Ledoux it!
Thread Starter
Join Date: Sep 2000
Posts: 14,252
Likes: 0
Received 0 Likes
on
0 Posts
*sigh*
I've lost about all motivation for this bitch
I just know how much work I'm gonna have in front of me, few days of glasswork and whathave you
and so much stuff is gonna take so long to do...
dynamat the truck = 2 days (dont even have the dynamat)
wiring = 1 day (might as well include this in the dyanamat so I dont have to pull the seats out 2 times)
kicks +rears = 1 day (assuming I go q forms)
sub enclosure = week I dont even have my sub, much less have 1/2 inch of glass on it and 12 ring and blah blah blah
easy 2 weeks fo work... and school starts in like 2 weeks, and only having like 3 days a week to work on it = 2 months
I just know how much work I'm gonna have in front of me, few days of glasswork and whathave you
and so much stuff is gonna take so long to do...
dynamat the truck = 2 days (dont even have the dynamat)
wiring = 1 day (might as well include this in the dyanamat so I dont have to pull the seats out 2 times)
kicks +rears = 1 day (assuming I go q forms)
sub enclosure = week I dont even have my sub, much less have 1/2 inch of glass on it and 12 ring and blah blah blah
easy 2 weeks fo work... and school starts in like 2 weeks, and only having like 3 days a week to work on it = 2 months
__________________
http://www.myspace.com/jdreade
http://www.myspace.com/jdreade
kinda reminds me of that time where my door leaked and ruined my q's on my driver side... and then i didn't have any money to A) get a new comp set for the front or B) wire in the new sub amp, and then i cried for three days straight about how i would never have good sound.... wait... that was today. fuck.