View Single Post
Old Jan 30, 2004 | 05:33 PM
  #9 (permalink)  
boostdshadow's Avatar
boostdshadow
old school
 
Joined: Sep 2003
Posts: 245
Likes: 0
Default

Good luck! I hope to find time to install a few parts that have been sitting around the garage for 4 months{NOS,manual valve body,3in swing valve,crankscraper and 52pph injectors}. Trying to break that 7 second barrier.
Reply