View Single Post
Old Apr 3, 2009 | 06:46 PM
  #93 (permalink)  
marksaccord95's Avatar
marksaccord95
TR Registered Member #5
 
Joined: Jun 2000
Posts: 7,377
Likes: 0
Default

After only being able to work on the car for 2.5 days, I left the car to Mckinney Motorsports to finish. They were really busy with other projects before mine, but they have been working on it here and there during my 11 day long business trip. The car really only needed probably another 7-10 hours of wiring and other misc things. The car is nearly complete and should be running Monday-Tuesday. Mckinney was nice enough to send me some updated shots since I have been gone.

Yes I plan to clean the engine bay better after it runs. Follow the captions



Engine with the tall, single plane intake manifold and air cleaner nearly clears. Some risers in the back may help and not require a cut out in the hood. Modified upper radiator inlet to allow for a direct shot. The large 3 core radiator was recessed in the core support some to allow for a little more space (but could have been done without).



Debris shield to keep anything coming off the tire from hitting my Holley 150 GPH billet fuel pump or Earls fuel filter.



Cut out for the 15 gallon cell, fuel pump sits level to the sump. All of the fuel system is complete.



The one piece driveshaft, and you can see the fuel lines running to the front.



All new power steering lines.
__________________
http://www.floridaracing.org



Editor - Stangtv.com - Dragzine.com

2011 Mustang GT Premium 6-speed manual Sterling Gray Metallic - New Project Car
SCT SF3 - FRPP Adjustable Handling Pack - Vortech 597 RWHP 476 lb/ft - 7.5 PSI

1965 Mustang - Blow thru Dart SBF 427ci with a Paxton NOVI-2500
Hydraulic roller, 91 octane, 1030HP

Reply