So the tubs are done sheetmetal wise. I just have to finish up some welding/grinding and possibly make a few reinforcement pieces. Which should all be done by tomarrow night.
A good scrubbing is next, then body filler to smooth out the rough spots and body seam sealer then primer and paint. After that I focus on the motor which should be done(ish) after next paycheck.
Only two pictures since there isnt much to look at.
The wedges are for extra tire clearence when the tire is turned in.
Damage side dosnt look to bad IMO. It actually came out better then passenger side.