Thread: Datsun Dreaming
View Single Post
Old Sep 20, 2008 | 06:36 PM
  #5096 (permalink)  
longfellow2's Avatar
longfellow2
FORE:sight
 
Joined: Dec 2007
Posts: 2,332
Likes: 0
Default

Energy suspension, Im all done, it took me about 6 hours to do it. Thanks for the offer though. Rear two were cake to take out. But the front two were the biggest bitches ever. The first attempt took me 2 hours, with a hammer, some chissles and a air hammer with a cutting tip.
After I found out how it was set up I just used a hack saw to cut through the outer rings then chissled them out. It took 30 minuts for that to work.

Car drives better; no more clunk clunk when I take off or hit the brakes. But im not looking forward to replacing the differential bushings now.

Next week or two im doing the rest of the ES kit with grease fittings. Im going to try and track down some Z32 uprights to save a little corner weight while Im at it..
__________________
Originally Posted by Epstein
Either way you're required to do it Tampa style. $1500 kit still gets $4.99 rattle can paint job. Bonus points if you use 2 different colors of gray.
Reply