Thread: Datsun Dreaming
View Single Post
Old Sep 10, 2008 | 06:31 PM
  #4875 (permalink)  
longfellow2's Avatar
longfellow2
FORE:sight
 
Joined: Dec 2007
Posts: 2,332
Likes: 0
Default

Originally Posted by Penis
Yes in good time I promise. I need to take care of a few more things before I start spending ass loads of more money on the thing.

I still have to:
Relocate the batt and put new wires so its actually safe and not sitting behind the driver seat
Fix my intercooler piping
Fix the positive batt terminal that is just an open wire I had to duck tape and actually mount it to something(whoever did the swap previously left the pos terminal open with other wires attached to it)
Fix my exhaust leaks(buy stock exhaust mani and change O2 housing

So yeah I have some things to do before I go baller body kit/Rim set. All that shit will take me till the end of the year. Maybe by next summer my car will be done.
Sweet. Im hoping to have my car finished by next summer as well. All I need is rear traction arms, bolt in cage, Bolt on's S14sr (280-300hp) Wilwood brake set up from AZC and a set of street wheels so I stop eating RT615's every 2-3 months.
__________________
Originally Posted by Epstein
Either way you're required to do it Tampa style. $1500 kit still gets $4.99 rattle can paint job. Bonus points if you use 2 different colors of gray.
Reply