Old Dec 22, 2006 | 02:20 PM
  #3 (permalink)  
Badlatitude's Avatar
Badlatitude
bbbblllllaaaaaaahhhhhhhh
 
Joined: Dec 2005
Posts: 3,459
Likes: 0
Default

I dont plan on rushing. By the 1st week of jan the 10 point should be done with the front drops to the frame .. sorta a 12 point but no X on the doors. along with tubing for sub frame connectors and the bracing on the rear.
__________________
Reply