So how does everyone like the engine bay, it took 3 days not to mention the pain in the ass sanding. Then putting back everything, that was sooooo much fun. Any how the car should be completed by this weekend, I still need to get someone to weld bov, get SS clutch line, minor wiring, wiring up electrical fans, cut holes for I/C piping, god thats a huge list, lol Well hopfully every thing is done so i can goto the Drift thingy!!?!?!
__________________

2640lb.
227.5 RWHP