Are ANY of the spring hill boys ready for feb 2nd?
Cochese? $shawn? me? LOL
3 stangs from the hill paid and registered .....
2 are definatly in pieces...... Are you up and running $hawn?
I have to basically build a car in 28 days and test and tune it.
I dont think its gonna make paint .. I hope Big jims door is hunter green LOL
3 stangs from the hill paid and registered .....
2 are definatly in pieces...... Are you up and running $hawn?
I have to basically build a car in 28 days and test and tune it.
I dont think its gonna make paint .. I hope Big jims door is hunter green LOL
__________________
I dont plan on rushing. By the 1st week of jan the 10 point should be done with the front drops to the frame .. sorta a 12 point but no X on the doors. along with tubing for sub frame connectors and the bracing on the rear.
__________________
I can see it now. I'll be building a new transmission the day before...again!
My car won't be too much different, more gear, nitrous timer, maybe a bigger jet if all goes well and I don't leave the t5 all over the track.
*Dear Santa I need a G-Force gear set!
My car won't be too much different, more gear, nitrous timer, maybe a bigger jet if all goes well and I don't leave the t5 all over the track. *Dear Santa I need a G-Force gear set!
Guest
Posts: n/a
you are big money, id thought youd have a jerico




<<<Peeps from outside publix